SURFACE AREA
2.500 m2
CONTRACT VALUE
+2.300.000 €
In 2015, we expanded our partnership with Iulius Group with the inauguration of the
Cinema City in Iulius Mall Suceava, the 22nd multiplex that the international network opened in Romania at that
time. Our connection with Cinema City projects had already been long-standing, since the construction of the
initial multiplex at Iulius Mall Iasi in 2007. The success of that endeavor led us to subsequent opportunities for
constructing additional Cinema City:
Cinema City Iulius Mall Iași (2007)
Cinema City Iulius Mall Cluj Napoca (2007)
Cinema City Euromall Pitești (2009)
Cinema City Afi Palas Cotroceni București (2009)
Cinema City Sun Plaza București (2010)
Cinema City Promenada Mall Brăila (2011)
Cinema City Shopping City Ploiești (2012)
Cinema City Shopping City Târgu Jiu (2014)
Cinema City Mega Mall București (2015)
Cinema City City Mall Constanța (2016)
Cinema City Park Lake București (2016)
Cinema City Shopping City Timișoara (2016)
Cinema City Shopping City Galați (2017)
Cinema City Iulius Mall Timișoara (building in 2007, expansion in 2009 & rebuilding in 2020)
Scope of work
Execution and turnkey delivery of interior architectural works: masonry cladding, screeds, ceilings,
finishes, and painting.
Installation of gypsum board partitions
Fireproof sealing solutions
Soundproof solutions (70dB)
Smooth and paneled ceilings
Installation of ceramic tiles, carpeting, PVC flooring, and sound-absorbing fabrics
Constructing a lobby ceiling with dual levels: the first level was designed to be fire-resistant, while the
second level featured intricate molding and a dynamic interplay of light and shadow.
The process
Concerning the architecture, the cinema project entailed assuming control over the site and
delivering a comprehensive turnkey solution. The Cinema City project of Iulius Mall Suceava presented a unique
undertaking, as it entrusted us with the responsibility of constructing the concrete seating tiers and allowing us
to maintain strict oversight over the delivery timeline of the hall and effectively coordinate the installation
teams.
The challenges
During the project, we faced a range of challenges that encompass meeting tight execution
timelines, streamlining the staging of construction processes for optimal efficiency, ensuring seamless
coordination with other specialized teams engaged, procuring large quantities of materials, and distributing
resources for maximum efficiency.